Swaelite Solutions

Industry / Biogas & Compressed Bio-Gas (CBG)

Biogas & CBG plant monitoring.

Connect available gas-quality, flow, pressure and equipment readings into a clear plant dashboard. Swaelite helps biogas and CBG operators review production, investigate deviations and prepare structured operating records. Integration depends on your instrumentation, hazardous-area requirements and agreed scope. Monitoring supports your existing controls and compliance processes.

Discuss your operation
Concept illustration for Biogas & Compressed Bio-Gas (CBG)
Concept illustration · Your setup will vary

What does plant monitoring connect?

A plant integration can bring gas analysers, flow meters, digester instrumentation and compressor controller readings into shared monitoring screens. Scope starts with the available instruments, calibration records and approved access. Monitoring and reporting remain separate from safety interlocks, gas testing and the responsibilities of the plant and receiving network.

01 / Common challenges

What makes biogas & compressed bio-gas (cbg) difficult to track?

01

Verifiable production & compliance documentation

Central schemes like the National Circular Bioenergy Scheme (FY27–FY36) and portal registrations require verifiable operational records. Plants need automated logging of daily production, flaring, and mass balance to support statutory reporting and audits.

02

Fuel quality & continuous gas analysis

Commercial automotive and grid-injected CBG must meet the current edition of IS 16087 and any network-specific limits for methane, CO2, H2S and moisture. Unmonitored purification variations risk off-spec gas reaching storage cascades or pipeline injection skids.

03

Heterogeneous field protocols & legacy controllers

Field instruments—ranging from NDIR gas analysers and thermal mass flow meters to compressor PLCs—use different interfaces (Modbus RTU over RS-485, Modbus TCP over Ethernet, and 4–20 mA signals through suitable acquisition hardware) that need unified edge consolidation.

04

Hazardous-area requirements & continuous operation

Parts of a biogas plant may be classified as hazardous areas. Instrumentation and gateways are selected against the approved area classification, gas group, temperature class and applicable equipment certification, or installed in a safe area where suitable, with work planned around plant operation.

02 / How we help

Solutions for biogas & compressed bio-gas (cbg).

03 / Equipment & starting points

Typical equipment in biogas & compressed bio-gas (cbg).

  • Thermal mass, Coriolis and ultrasonic gas flow meters (raw biogas and purified CBG in Nm³/hr or kg/hr)
  • Continuous multi-gas analysers (NDIR Methane CH4 % and Carbon Dioxide CO2 %)
  • Continuous H2S gas analysers (electrochemical / optical), moisture/dew-point instruments and desulphurisation system instrumentation
  • Anaerobic digester temperature sensors and dual-point pressure transmitters
  • Compressor booster skids, automated safety relief valve monitoring, and flare stack thermocouples
  • Fermented Organic Manure (FOM) / bio-slurry weighbridge logging and dispatch records
Where we begin

We evaluate your plant instrumentation schedule and available controller communication interfaces (Modbus RTU over RS-485, Modbus TCP over Ethernet, or analog loops). Integration methodology is designed to respect site hazardous-area classifications and minimise production disruption. Swaelite configures an industrial edge platform that consolidates flow, gas composition, and pressure readings into local operator dashboards and automated reporting archives.

04 / Example scenarios

Illustrative starting points.

01

Commercial CBG plant gas-quality & SCADA integration

Interface edge gateways with raw biogas flow meters, NDIR gas analysers, and compressor PLC registers on a commercial CBG facility. Deliver real-time browser SCADA tracking CH4 purity against the plant’s agreed quality limits and generating automated daily production summaries.

02

Agri-waste biogas & bio-slurry operational logging

Consolidate multiple anaerobic digester pressure/temperature transmitters, flare stack thermocouples, and FOM weighbridge entries into a central logging system. These signals contribute to operational records; a validated mass balance needs a defined measurement and reconciliation scope.

Example starting points. Suitability depends on your equipment and project requirements.

05 / Practical questions

Know what to ask.

Which GOBARdhan registration portal should our plant use?

Under Government of India guidelines, general rural/industrial Biogas plants register on gobardhan.sbm.gov.in (managed by the Ministry of Jal Shakti / DDWS). Commercial Compressed Bio-Gas (CBG / Bio-CNG) plants register on the dedicated CBG portal at gobardhan.eil.co.in, maintained by Engineers India Limited under the Ministry of Petroleum and Natural Gas (MoPNG).

How does the system support gas-quality monitoring and compliance records?

Automotive and piped CBG must meet the current edition of IS 16087 (PNGRB's February 2026 guidance references IS 16087:2025) and any limits set by the receiving network. Swaelite Web SCADA logs methane, carbon dioxide, H2S and moisture readings from online analysers and raises visual alerts when values drift towards agreed limits. Compliance also depends on calibrated instrumentation, sampling and testing, operating procedures and the responsible plant and network parties. Monitoring does not replace certified protection or automatic isolation of off-spec gas.

IS 16087:2025 — BIS standard (EIL-hosted copy) ↗

What monitoring data can Swaelite integrate for pipeline injection (CGD/NGPL)?

PNGRB's guidance for injecting CBG into City Gas Distribution or Natural Gas Pipeline networks covers metering and gas-quality skids, including flow, pressure, composition, moisture and H2S analysis, automatic isolation of off-spec gas, sampling, calibration and record keeping. Swaelite can connect to metering skids and analysers to log and share these readings where authorised. SCADA alerts do not replace the skid's interlocks; check the current PNGRB guidance and your network operator's requirements.

PNGRB injection guidance — 11 February 2026 ↗

Does edge gateway installation require shutting down digesters or compression skids?

Integration methodology is planned around your plant operating schedule to minimise downtime. Where instruments provide available digital interfaces (Modbus RTU over RS-485 or Modbus TCP over Ethernet), connections can often be made without halting gas compression. Any physical tapping or electrical isolation is coordinated during planned plant maintenance intervals.

What financial incentives are available for CBG projects in 2026?

Under the GOBARdhan National Circular Bioenergy Scheme approved by the Union Cabinet on 6 August 2026 (outlay ₹23,731 crore for FY27–FY36), eligible greenfield CBG projects may receive capital assistance up to ₹2 crore per TPD of installed capacity, along with assured offtake at administered pricing (announced at ₹2,110/MMBTU) and pipeline infrastructure support, subject to applicable guidelines and scheme eligibility.

PIB scheme announcement — 6 August 2026 ↗

06 / Primary documentation

Regulatory & technical references.

Technical content reviewed: 22 September 2026

Review owner: [Owner to assign a named technical reviewer]. Review at the next content update and when source guidance changes.

Regulatory & Commercial Disclaimer

Government schemes, incentives, technical requirements and eligibility conditions may be revised from time to time. Project eligibility and applicable requirements should be verified against the latest notifications and guidelines issued by the relevant authority. Swaelite Solutions provides industrial automation, monitoring and integration services and does not guarantee Government approvals, subsidies or third-party contractual outcomes.

Start with your equipment.

Tell us what is difficult to see or keep track of in your biogas & compressed bio-gas (cbg) operation. We can discuss whether this is a useful place to begin.

Prepare an enquiry ↗Explore all industries →